Aller au contenu principal
Implementing an ICAO compliant SMS: writing terms of reference for a consultant

Publié le October 25, 2026

Implementing an ICAO compliant SMS: writing terms of reference for a consultant

How to write terms of reference for implementing an ICAO compliant SMS and choose the consultant best suited to your organization.

A safety management system, or SMS, structured around ICAO Annex 19, is now expected from most operators, airports and air navigation service providers across West and Central Africa. Many organizations already have pieces of an SMS in place, but in a fragmented way: a safety policy that exists on paper but is rarely communicated, event reports collected without real analysis, or a safety committee that does not meet regularly. Bringing in an external consultant helps turn these pieces into a coherent, documented system that is genuinely used day to day.

Before writing terms of reference, it is worth conducting an honest stocktake: which elements of the SMS already exist, which are missing, and what the real maturity level of the teams is when it comes to safety culture. Even a brief stocktake helps the consultant propose a methodology genuinely suited to the organization rather than a generic approach.

What does an SMS implementation assignment cover?

A typical assignment usually covers defining the safety policy and associated objectives, building a hazard identification and operational risk analysis process, setting up a system to collect and process event reports, defining safety performance indicators, and establishing a governance structure, a safety committee, periodic reviews and clearly assigned responsibilities. The consultant also often supports spreading a safety culture among teams, a condition for the SMS to remain more than a document on a shelf.

Which criteria matter when choosing the consultant?

A precise understanding of ICAO Annex 19 and its practical application is a first criterion, but it is not enough on its own: the consultant also needs to adapt the methodology to the organization's actual size and maturity rather than imposing an oversized standard model. The ability to transfer skills to internal teams, so they can keep the SMS alive without permanent dependence, is equally important. Finally, experience with organizations of a comparable size, in a similar regulatory context, makes implementation smoother.

What questions should you ask before signing?

It is useful to ask how the consultant assesses safety maturity at the start of the assignment, which documents and tools will be delivered at the end (SMS manual, procedures, risk analysis grids), how teams will be trained to use these tools, and what follow up support is offered in the months after implementation, for example to adjust the system based on early feedback.

What should the terms of reference include?

Terms of reference for an SMS assignment should specify the type of organization (airline, airport, air navigation service provider), the SMS elements already in place, the objectives expected from the assignment, the scope of sites or activities involved, the desired deliverables, the level of involvement expected from internal teams, and availability constraints for workshops and training sessions.

What makes the cost of an SMS assignment vary?

Cost mainly depends on the organization's initial maturity level: starting from scratch requires more work than structuring elements that already exist. The size of the organization, the number of sites involved, the number of teams to train in safety culture, and the depth of support wanted after implementation also weigh heavily on the final cost. An assignment limited to documentation costs less than one that includes full team training and ongoing follow up.

What mistakes should you avoid?

The most common mistakes include copying another organization's SMS manual without adapting it, treating the SMS as a purely documentary exercise without involving operational teams, neglecting safety culture training, and failing to plan a periodic review mechanism once the system is in place, which leaves it outdated fairly quickly.

How do you ensure follow up after the SMS is implemented?

An SMS that stays genuinely alive within the organization requires follow up after the assignment ends: appointing an internal lead to run the safety committee, periodically reviewing the performance indicators defined with the consultant, and adjusting procedures as the activity evolves. Checking back with the firm for a progress review a few months after implementation often helps correct early adjustments before they turn into significant gaps.

What SmartAero offers

SmartAero Consulting supports the implementation of ICAO compliant safety management systems for airlines, airports and aircraft operators, including analysis and mapping of operational risks, setting up incident investigation and lessons learned processes, and developing a safety culture within teams. These assignments draw on ICAO standards as well as the requirements of local authorities across West and Central Africa.

To discuss implementing your SMS and get a quote, visit smartaero-newgen.com/en/aviation, then submit your request through smartaero-newgen.com/en/contact, describing the current state of your safety arrangements.

← Retour aux actualités